OUR
PROJECTS

Chestnut Street Drainage Improvements – Conway, AR

Construction

Steep Creek replaced downtown Conway’s drainage system with a new box culvert, including trenching and backfill

View Project

Stillhouse Branch Pedestrian Bridge – Batesville, AR

Construction

Severe flooding damaged the Riverside Park pedestrian bridge in Batesville, AR, leading to its replacement with a

View Project

Hwy 175 Water Line Relocation – Cherokee Village, AR

Construction

The team relocated water lines ahead of state highway work, including traffic control, utility installations, exc

View Project

Maxwell Street 18-inch Sewer Interceptor – Siloam Springs, AR

Construction

Severe flooding damaged the Riverside Park pedestrian bridge in Batesville, AR, leading to its replacement with a

View Project

Stanley Road Bridge Replacement – Faulkner County, AR

Construction

Steep Creek removed the existing bridge and constructed a new 62' x 24' - 6" bridge.

View Project

Withrow Springs State Park – Dam Restoration – Huntsville, AR

Construction

Steep Creek constructed a new concrete wall adjacent to the existing dam and installed a gate valve for flow cont

View Project

Withrow Springs State Park – Spring Area Renovations – Huntsville, AR

Construction

Steep Creek repaired approximately 400 linear feet of existing stone wall along the spring and restored eroded ar

View Project